Notice and posting before exterior abatement
An abatement job starts on paper. CDPH Form 8551 reaches the state five days or more ahead and is posted at the work area’s entrances, and written notice goes to the residents of the house and of adjoining dwellings, so a shared fence or attached unit calls for an early conversation.
Permits for exterior work in Union City
We could not read Union City’s own permit guidance for this page, so we do not state which exterior jobs need a permit. Before re-stuccoing, replacing siding or changing openings, ask the city’s Building Division what applies. A paint job may not need a permit, but if the house predates 1978, prep work that disturbs paint is still covered by the lead rules.
What affects the cost
Access sets the scope of exterior work more than anything: ground-level walls on a one-story house are quick, while upper walls need scaffolding wrapped in containment. Failing paint area, rotted boards, strip-versus-stabilize decisions and the extra steps of permanent abatement widen or narrow it.
Door frames, sashes and sliding doors belong to lead paint window and door work. Exterior paint that is sound enough to stay, such as on a stucco wall that has not cracked, belongs to lead paint encapsulation. A house finished in 1978 or 1979 sits outside the pre-1978 rules, so confirm the build year before planning work. Union City’s 6,676 homes from the 1970s and 2,372 from the 1960s are summarized on the Union City Lead Paint Removal homepage, along with every other service.