Peeling eave and window frame stripped on a 1950s stucco house
Example project

- Home
- 1950s single-story stucco house in Union City
- Original request
- Strip the peeling eave and the window frame below it in one visit
- Testing
- Lead paint on the fascia, the rake boards and the blue window frame; the stucco and the bare wood blocks under the eave are clear
- Surfaces
- One corner: fascia, rake boards and the window frame, about 110 sq ft
- Notice
- CDPH Form 8551 posted and sent at least five days ahead; neighbors told in writing
- Estimated cost
- $2,000
Scope of work
Plastic on the ground well out from the wall and sheeting hung below the eave, the fascia, rake boards and window frame stripped with a paste stripper and wet scraping, waste bagged each day, primer and two coats of lead-free paint, and a clearance check of the ground and the sill. The window itself and the stucco are not part of this price.
Project overview
In this example, the owners of a 1950s stucco house in Union City see white and blue-gray paint peel to bare wood on the fascia and rake boards at one corner, and the blue frame of the window under it is going the same way. A test shows lead paint on the fascia, rake boards and frame. The stucco and the bare wood blocks under the eave are clear.
They want the frame and the eave done in the same visit, and for good, so the job is abatement. Form 8551 is posted at the house and sent to CDPH at least five days ahead, and the neighbors on the shared fence are told in writing.
The goal
The goal is a corner with no lead paint on it and a window frame that is done at the same time.
Process
- Notice Form 8551 posted and sent; letters to the neighbors.
- Setup Plastic laid on the ground and hung below the eave.
- Stripping Fascia, rake boards and frame stripped wet, waste bagged daily.
- Paint Bare wood primed and given two coats.
- Clearance Ground and sill checked for chips and dust before the plastic comes down.
Planning right
- Never dry-scrape or sand an eave. The dust lands on the yard and in the open window below.
- Soft wood at the lower end of a fascia board is replaced at extra cost.
- Stucco that tests clear can be left as it is, so only the wood is stripped.
- Put the clearance report in the folder with the house papers.